I finally got the rusted on secondary off and cleaned up.
While working on it, I noticed that it has a 53 degree ramp in it.
This with the hot setup of the 102 that I have on the 500 fan ought to make it very quick.
Then to get the seat and rest of the cooling system off, I had to drop the track.
The rest of the drive will also be coming out so I can put new bearings in there.
As you can plainly see, I will need to redo all the bearings and shocks in the skid.
